Bintulu Dengkil kerja sambilan - We understand that the area has its needs, and even in the Cabinet meeting (this morning), its necessity was discussed (to build a highway between Tanjung Malim and Lumut), he said, adding that the proposal for the project is still under discussion.

    Bintulu Dengkil kerja sambilan - We understand that the area has its needs, and even in the Cabinet meeting (this morning), its necessity was discussed (to build a highway between Tanjung Malim and Lumut), he said, adding that the proposal for the project is still under discussion.

    08/06/2024 00:10:00(Dengkil kerja sambilan)

    Dengkil kerja sambilan - We understand that the area has its needs, and even in the Cabinet meeting (this morning), its necessity was discussed (to build a highway between Tanjung Malim and Lumut), he said, adding that the proposal for the project is still under discussion. Jengka mencari wang The MACC added that in total, from 2019 to date, it has recovered RM29.03 billion of 1MDB assets through its asset recovery special task force in collaboration with foreign agencies.

    Friendship link: